Avon Public Library
The first phase of this project included renovation of the Main Level Library public spaces to include new architectural LED lighting, new floor and wall coverings, new Circulation Desk, Study
...Harrison Hills Elementary
The project of Harrison Hills Elementary School included additions and renovations to several parts of the school. Structural systems, architectural elements, plumbing, fire protection, and
...Kirkwood Hall - Indiana University
The IU Kirkwood Hall project in Bloomington was a complete building renovation. The design maintained certain original building elements while inserting more modern pieces to give the
...IU School of Public Health-Bloomington
This was a two story existing building with a courtyard. The project was to infill the courtyard with a new 3-story addition, which created special challenges as we had to keep the existing
...Wells Library Cafe, Indiana University
This project included converting the old Wells Library (IU Bloomington) cafeteria in the Lower Level into the new Cyber Café. The work consisted up of demolition to existing parts of the building
...Van Buren Elementary
The project for Van Buren Elementary consisted up of renovations and additions to the existing school building. The renovations comprised of some of the classrooms and
...Brownsburg Public Library
This project is a phased complete renovation of all interior spaces to include new Circulation space, Offices, Work Rooms, Meeting Space, Restrooms, and complete finish upgrades to all stack
...Danville Public Library
Project included a 2,00sf 2-story addition over basement and interior renovation of remaining spaces
Cabin Coffee Co.
The project included demolition of existing Custard Shop and design and construction of 2,500sf cabin themed Coffee Shop. Building was wood framed structure with brick veneer and shingle
...White Oak & Maple Elementary
Both schools included a new canopy addition with secure vestibule and admin office remodel.
Hendricks Cty Bank & Trust
This was a new bank headquarters facility in Brownsburg, Indiana. Our work included metal stud framing, drywall installation and finishing, acoustical ceiling installation and exterior EIFS
...Crosspointe Church and School
Phase 1 included the renovation of an existing 22,000sf banquet facility to create worship and office space, as well as K-12 classroom space. Work included many
...IUPUI - HITS Building
This project was an existing shell space build out. With tall windows looking out over the canal in downtown Indy, this space included all new metal stud and drywall office partitions, all
...Crestview Elementary
An interior renovation project consisting mostly of new floor and wall finishes. The renovation included new gymnasium flooring and a complete Media Center / Computer Lab rebuild with new
...